Skip to content
Sierra Voices Journal

Sierra Voices Journal

RISE Gold Compelled To Cleanup Existing Idaho-Maryland Mine Tailings

RISE Gold Compelled To Cleanup Existing Idaho-Maryland Mine Tailings

January 22, 2020 SVadmin Comments 0 Comment

Jan 21, 2020, Press Release
Facing EPA Superfund Designation, RISE Gold Compelled To Cleanup Existing
Idaho-Maryland Mine Tailings

While Canadian mining company RISE Gold Corp was promoting the gold mine potential and alluring prospects of gaining permits to reopen the Idaho-Maryland Mine (IM Mine) in Grass Valley, CA, federal and state regulatory agencies were focusing on the polluted tailings that cover most of the 56.4 acre site and taking steps leading towards a Superfund Designation.

There has been little public disclosure of the contaminated legacy IM Mine tailings, but correspondence from the EPA dated Sept 26, 2019 indicates that IM Mine’s potential designation as a Superfund site was conditionally deferred because RISE entered into a cleanup contract with the California Department of Toxic Substance Control (DTSC).[1] OnAugust 13, 2019, RISE Gold Corp CEO Ben Mossman signed agreements to cleanup the site,
also known as the Centennial site.[2] According to the DTSC records, RISE has been dealing with this issue from at least as early as March 13, 2019, when the first Scoping Meetings with the DTSC took place.[3]

Tests conducted in 1993 by Vector Engineering showed elevated levels of arsenic, chromium, copper, mercury, lead, and nickel over two large areas of the legacy tailings, one area originating from the Mercury gold extraction processing that took place prior to 1926, and a second area being from the Cyanide extraction processing that took place from 1936 until the mine closed around 1956.[4] More recent reports from the DTSC determined thatlead, arsenic, nickel, and mercury are present at hazardous levels.[5] Contaminated tailings cover roughly 2/3 of the 56.4 acres with depths ranging from 2 to 20 feet.

As an additional complication, RISE Gold’s recent bid to re-open the mine includes plans to use the site for disposal of 1.6 million tons of mine waste rock and tailings as “engineered fill” over the course of 5 years, covering 44 acres and creating a built-up area 30 to 70 feet
above current grade. However, a recently posted geotechnical report indicates that the legacy tailings are not structurally adequate for use underneath the engineered fill, so theyhave to be completely excavated before the dumping can take place.[6] The full extent of the contamination within the tailings is not yet clear, but even if some of the tailings are clean they will all have to be extracted and then remixed with other aggregates before they would be stable enough to be built upon as planned.[7]

Rise Gold has not yet revealed what procedures will be used to get the legacy tailings off the bedrock and safely dealt with before the new waste rock and tailings from mine operations can be deposited. Nor is it clear whether the contaminated tailings will need to be sequestered separately on site, whether they can be integrated into the engineered fill, or whether they need to be trucked to a waste disposal facility.

According to the agreement, the entire remediation process will be overseen by the DTSC. However, Nevada County and other government agencies will be overseeing all operations with respect to the IM Mine’s re-opening permits, which is independent of the DTSC permitting and is a separate project with a separate time frame.


[1] US EPA Transmittal of Preliminary Assessment Report, Sept 26, 2019;
https://www.envirostor.dtsc.ca.gov/public/final_documents2?global_id=29100007&enforcement_id=60472136

[2] Cleanup Agreement, Signed by RISE Aug 13, 2019;
https://www.envirostor.dtsc.ca.gov/public/final_documents2?global_id=60000716&enforcement_id=60458269

[3] Ibid., Exhibit E

[4] “Contaminant Assessment of the Bouma-Erickson-Toms Property”, Vector Engineering,
Nov 1993.

[5] Centennial Geotechnical Report, NV5
https://www.mynevadacounty.com/DocumentCenter/View/31540/Centennial-Industrial-
Site-Geotechnical-Engineering-Report

[6] Centennial Site History, DTSC,
https://www.envirostor.dtsc.ca.gov/public/profile_report?global_id=60000716

[7] Idaho-Maryland Mine Project Description, Nov 2019, pg 16;
https://www.mynevadacounty.com/DocumentCenter/View/31023/Applicants-Project-
Description

Content provided by Community Environmental Advocates Foundation (CEA Foundation)
*** Visit the CEA website at www.cea-nc.org *** Contact via info@cea-nc.org ***

Print Friendly, PDF & Email

Articles, Environment, Local, Mining

Post navigation

PREVIOUS
From Bach’s “Art of the Fugue” to Tuba Skinny’s “Jubilee Stomp”
NEXT
Over An Hour of Tuba Skinny !

Leave a Reply

Your email address will not be published. Required fields are marked *

History of Labor

BOOK: “Not A Nation of Immigrants”

POETRY OF LAURA PELTON SWEET

Ending New York Funding of Israeli Settler Violence Act

“World’s Most Dangerous Place for a Child”

PLEDGE TO STOP GENOCIDE

DONATE TO ANTIWAR.COM

======= DONATE =======

SIGNUP FOR SIERRA VOICES NEWSLETTER

Please wait...

Thank you for signing up!

PEACE IN UKRAINE

CLICK ON IMAGE FOR CODEPINK

WHERE HAVE ALL THE SOLDIERS GONE?

CLICK IMAGE BELOW TO WRITE ONLINE LETTER OPPOSING THE MINE

DONATE TO THE FOOD BANK OF NEVADA COUNTY

(CLICK IMAGE)

DONATE TO NEVADA COUNTY RELIEF FUND (click image below)

Jack Kornfield: A Steady Heart in Time of Corona Virus (Part I)

Erika Lewis, Shaye Cohn, Craig Flory – Got A Mind To Ramble

“Everlasting Arms”

Tara Brach: A Steady Heart in Time of Corona Virus (Part II)

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

POETRY OF LAURA PELTON SWEET

© 2026   All Rights Reserved.